Chandrayaan-3 health normal, enters moon’s sphere of influence

ISRO’s third mission to the moon performed the TransLunar injection manoeuvre on July 31

Updated - August 01, 2023 09:43 pm IST - Bengaluru

Indian spacecraft Chandrayaan-3 travels after it was launched from the Satish Dhawan Space Centre in Sriharikota on July 14.

Indian spacecraft Chandrayaan-3 travels after it was launched from the Satish Dhawan Space Centre in Sriharikota on July 14. | Photo Credit: AP

The health of the Chandrayaan-3 spacecraft is normal and it has entered the moon’s sphere of influence following the TransLunar Injection (TLI). The Indian Space Research Organisation (ISRO) performed TLI to slingshot Chandrayaan-3 towards the moon early on Tuesday.

The TLI was performed successfully from ISRO Telemetry, Tracking, and Command Network (ISTRAC) in Bengaluru.

The space agency updated that the health of the spacecraft which was launched on July 14 is normal.

“The spacecraft’s health is normal. Tuesday’s perigee burn has successfully raised Chandrayaan-3 orbit to 288 kmx3,69,328 km. In this orbit, the spacecraft enters the moon’s sphere of influence. A crucial manoeuvre at perilune would achieve the Lunar Orbit Injection (LOI),” the space agency said.

Post the midnight TLI, ISRO said: “Chandrayaan-3 completes its orbits around the Earth and heads towards the Moon. A successful perigee-firing performed at ISTRAC, ISRO has injected the spacecraft into the translunar orbit,” the space agency said. The TLI was planned for August 1 between midnight and 1 a.m.

Chandrayaan-3 is expected to reach the lunar orbit on August 5 and the spacecraft’s liquid engine will be fired again to insert the spacecraft into a lunar orbit. “LOI is planned for August 5,” ISRO added.

Data | Chandrayaan-3 mission: How tough is it to land on the moon? 

After this, there will be four orbit manoeuvres to make the spacecraft enter into its final orbit at a distance of about 100 km from the moon’s surface. The Chandrayaan-3 consists of a lander module (LM), a propulsion module (PM) and a rover.

The PM and LM separation would happen on August 17. A series of deboost manoeuvres are also scheduled to take place before the power descent phase for soft-landing on the moon. The lander is expected to touchdown on the moon surface on August 23 at 5.47 p.m.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.