Elevated corridor of 3 km proposed on Tiruchi-Madurai national highway, near upcoming Panjapur bus terminus

The National Highways Authority of India has sought an expert opinion from NIT-Tiruchi for the corridor, which is aimed at easing congestion on the stretch, once the bus terminus is commissioned

December 26, 2023 04:16 pm | Updated 04:17 pm IST - TIRUCHI

A view of the integrated bus terminus (IBT) project in Panjapur in Tiruchi that is due to be opened soon

A view of the integrated bus terminus (IBT) project in Panjapur in Tiruchi that is due to be opened soon | Photo Credit: MOORTHY M

The National Highways Authority of India (NHAI) has prepared a Detailed Project Report (DPR) for the construction of an elevated corridor on the Tiruchi - Madurai national highway near the upcoming Integrated Bus Terminus in Panjapur, in Tiruchi. The NHAI has sought an expert opinion from the National Institute of Technology (NIT), Tiruchi regarding the proposed elevated corridor. 

The elevated corridor has been proposed for a distance of about 3 km on the national highway, to ease congestion once the integrated bus terminus is commissioned. NHAI authorities said although the detailed project report had been prepared, an expert opinion from NIT has been sought with regard to aspects such as traffic engineering and transportation. Feedback from the institution would suitably be incorporated into the detailed project report and it would then be forwarded to the NHAI headquarters at New Delhi to obtain approval and sanction of work, a senior NHAI official said. 

The construction of the elevated corridor project has been pegged at around ₹350 crore.

The proposed elevated corridor would be a four-lane carriageway, which would pave the way for “through traffic” on top for vehicles bound for the south, and for those proceeding towards the north from the south. Given the volume of traffic to the integrated bus terminus and back, the elevated corridor would substantially ease congestion near the proposed terminus adjoining the busy Tiruchi - Madurai national highway stretch. 

The elevated corridor has been conceived keeping in mind future developments, volume of vehicular traffic and the truck terminal that is coming up near the integrated bus terminus, the official said. The bus terminus project, being executed at a cost of around ₹350 crore on 40.6 acres of land, will have 404 bus bays including 142 bays for long-distance buses, 124 for mofussil buses and 60 bays for city buses.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.