Inspection of Madurai-Bodi electrified line on Saturday

March 22, 2024 07:53 pm | Updated 07:53 pm IST - Madurai

Principal Chief Electrical Engineer (PCEE), Southern Railway, A.K.Siddhartha, will conduct the statutory Inspection of the newly-electrified Madurai-Bodinayakkanur section on Saturday.

The inspection for the electrified line for 89.91 km is scheduled to commence from Madurai Junction at 9.30 a.m. and to conclude at Bodinayakkanur at 1.30 p.m.

The inspection will focus on safety standards followed in the newly-provided overhead equipment (OHE) system and allied infrastructure. Checks will be held at level-crossing gates, beneath the road overbridges and foot overbridges, at curves, at stations and at power line crossings in the section.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.