Proposals to build more storage structures across the Palar remain on paper

Water Resources Department is either awaiting funds or design approval of the structures to execute the projects

August 23, 2022 12:23 am | Updated 12:23 am IST - CHENNAI

There is a plan to build a series of storage structures across the Palar to conserve a portion of the surplus water that otherwise is draining into the sea. 

There is a plan to build a series of storage structures across the Palar to conserve a portion of the surplus water that otherwise is draining into the sea.  | Photo Credit: S.R. RAGHUNATHAN

The proposals to build storage structures including barrages and check dams across the Palar river in Chengalpattu district and Kancheepuram district remain on paper for many months now.

The Water Resources Department (WRD) is either awaiting funds or design approval of the storage structures to execute the projects. It had proposed to build a barrage across the river near Udayambakkam-Padalam, falling in Chengalpattu district.

Sources in the WRD said it was part of the plan to build a series of storage structures across the Palar to conserve a portion of the surplus water that otherwise was getting drained into the sea. The department had submitted a revised design following record flow experienced in the river last year.

It may be recalled that the water flow touched 1.65 lakh cusecs (cubic feet per second) last year. The height of the barrage was designed at a maximum of five metres so that a minimum of 0.5 thousand million cubic feet (tmcft) could be stored.

There are plans to divert the surplus water to seven water bodies, such as Pallipattu and Pallavankulam, apart from storing water for a distance of four km in the upper reaches of the riverbed. This storage structure alone would benefit residents of 23 villages and help irrigate nearly 7,700 hectares of land.

Officials noted that the water saved in the Palar riverbed could also be diverted to cater to the drinking water needs of neighbouring areas, like Chengalpattu or Tambaram and other parts of the city through a pipeline.

A 7.5-metre-wide bridge over the barrage has also been planned to fulfil residents’ long-pending demand. Many of them now took detours to reach sugarcane and paddy mills in Madurantakam taluk.

Similar projects to build check dams at Nallathur, Vengudi and Venkatapuram are under the government’s scrutiny, officials added.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.