Chennai: Green light to fix Porur lake channels

Water Resources Department will build channels to bridge the missing links between various surplus courses and waterbodies in and around Porur lake as part of the flood-mitigation work, with the government sanctioning eight schemes at an estimate of ₹250 crore

April 21, 2022 01:32 am | Updated 01:15 pm IST - CHENNAI

Besides improving regulators in Porur lake, the Water Resources Department proposes to augment the carrying capacity of the waterbody’s surplus course.

Besides improving regulators in Porur lake, the Water Resources Department proposes to augment the carrying capacity of the waterbody’s surplus course. | Photo Credit: K. PICHUMANI

The Water Resources Department will build channels to bridge the missing links between various surplus courses and water bodies in and around Porur lake as part of the flood-mitigation work.

A government order was issued on Tuesday sanctioning eight projects with an estimate of ₹250 crore to prevent flooding in the city and suburbs. About ₹100 crore has been allocated to build new channels and improve surplus courses around Porur lake. Several works were carried out to widen the Adyar and its tributaries post 2015 floods. The department has devised projects to prevent flooding in the surrounding areas of the Adyar and Kosasthalaiyar rivers by widening certain portions of the waterways.

Although nearly 18 permanent flood-mitigation projects have been chalked out at an estimated cost of ₹1,297.49 crore, only some of them would be prioritised and taken up by May-end due to paucity of funds.

Officials said prevention of flooding in localities around Porur, Mangadu and Iyyanpanthangal belt was one of the major challenges. The width of the Porur lake’s surplus course was inadequate and had missing links. Besides improving regulators in Porur lake, the carrying capacity of the waterbody’s surplus course would be increased.

A new channel would be built to connect flood water from Thanthikal channel with Porur surplus course near Koluthuvancheri Road. The branch channels of Thanthikal channel were heavily encroached upon in the rapidly urbanised areas and this led to flooding in localities, including Iyyapanthangal and Koluthuvancheri, during monsoon last year.

Another cut and cover channel would be built at Porur lake along with a new sluice to convey excess water to Ramapuram lake at a cost of ₹39.60 crore.

The department has proposed to provide additional box culverts along NHAI’s Chennai bypass in Kundrathur taluk to provide relief from recurring floods in the neighbouring areas.

“We have started preparatory work and work will be accelerated to provide respite from waterlogging during the ensuing northeast monsoon,” said an official.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.