Walking track shrinks Nacharam lake

Water body loses an additional 15 acres after the GHMC filled it to lay a 20-metre-wide walking track stretching to over 3 km over the past four months

Published - May 26, 2021 10:39 pm IST - Hyderabad

The Nacharam Pedda Cheruvu is a shadow of its self as it has shrunk due to a 20-metre wide path laid inside the FTL. Photo: Serish Nanisetti

The Nacharam Pedda Cheruvu is a shadow of its self as it has shrunk due to a 20-metre wide path laid inside the FTL. Photo: Serish Nanisetti

The Nacharam Lake has shrunk by an additional 15 acres after the Greater Hyderabad Municipal Corporation filled it to lay a 20-metre-wide walking track stretching to over 3 kilometres over the past four months. The amount of land filled up is bigger than the Wankhede Stadium in Mumbai. On the southern side, the width of the land filled up is more than 40 metres, ignoring the natural contours of the lake. “This was laid in three months’ time,” said a GHMC staffer guarding the site which has an attached garden. The natural rock formations inside the lake have been blasted near the weir on the eastern side of the lake, robbing it of its natural beauty that had an eight-foot-high fence running around it protecting from encroachments.

A 2013 Hyderabad Metropolitan Development Authority survey showed that the Nacharam Pedda Cheruvu was spread over 108.3 acres. The areas surrounding the Nacharam Pedda Cheruvu including Indira Nagar and Raghavendra Colony were swamped in September 2017 after a series of upstream lakes got flooded. The Nacharam Pedda Cheruvu is part of the chain of lakes beginning with Safilguda Lake, Mirzalguda Cheruvu, Nacharam Cheruvu that empties into the Nacharam Pedda Cheruvu. The water from the lake then flows on through a series of channels to Nallacheruvu in Peerzadiguda before draining into the Musi River near Nagole.

“By filling up the lake with such a wide road which the GHMC is calling walking-cum-cycling track they are annihilating the lake. The lives of people around the lake are being put at risk due to this filling up of the lake,” says environmental activist Lubna Sarwath who has moved the Telangana State Human Rights Commission against the activities of the civic body. “On the southern side, the road has been laid inside the lake dividing it into two allowing more encroachments. A private telecom company has erected poles on the road. These activities are not permitted inside the Full Tank Level (FTL) of any lake,” says Ms. Sarwath.

Hyderabad has been affected by a series of localised urban flooding due to encroachments in the FTL of lakes and construction activity on the nalas and water channels. In October of 2020, the southern part of Hyderabad witnessed massive flooding as a series of lakes broke the bunds creating havoc in large swathes of the city.

As Hyderabad prepares for another normal monsoon predicted by India Meteorological Department, it remains to be seen how the filling up of the Nacharam Pedda Cheruvu affects the surrounding areas.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.