Panel visits Mullaperiyar

L.A.V. Nathan, heading the panel, told reporters that the seepage of water had increased by 20 litres a minute during the last 10 days after the dam water rose in the monsoon rain.

September 16, 2014 11:09 am | Updated 11:15 am IST - KUMILY:

The three-member apex committee and five-member subcommittee, constituted for the smooth implementation of the Supreme Court order raising the  Mullaperiyar water level to 142 ft., pat the dam on Monday.

The three-member apex committee and five-member subcommittee, constituted for the smooth implementation of the Supreme Court order raising the Mullaperiyar water level to 142 ft., pat the dam on Monday.

The three-member apex committee and five-member subcommittee constituted for the smooth implementation of the Supreme Court order raising the Mullaperiyar water level to 142 ft. visited the dam on Monday.

They collected the samples of water seepage though the dam.

L.A.V. Nathan, heading the panel, told reporters that the seepage of water had increased by 20 litres a minute during the last 10 days after the dam water rose in the monsoon rain.

However, he said there was no need for any concern as the dam was safe and the seepage was within the permissible limit. The sub committee had conducted an inspection of the dam on September 5 when the reading was about 70 litres a minute.

Members representing Tamil Nadu in the sub committee boycotted the meeting after Kerala specified that the seepage level should be entered into the minutes and the State should also get the details of the seepage water level in the past which was taken by the Tamil Nadu Public Works Department.

The demand was said to be rejected by the Tamil Nadu representatives and the meeting ended abruptly. Mr. Nathan said that it was decided that the chemical examination of the water seeping through the dam would be carried out.

The committee decided to invite the Kerala State Electricity Board and Forest Department officials to the next meeting on October 20 to discuss issues of laying a road to the dam through the forest and providing electricity connection in the dam area. Tamil Nadu’s representative at the last visit to Mullaperiyar dam Madhavan was replaced from the five-member subcommittee with Rajesh, Superintending Engineer, Vaigai River Basin division, Madurai.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.