Steps to shift VSSC’s massive cargo from Kollam to Thumba

Hydraulic-axle trailer to move at 10 km a day

Updated - August 16, 2021 09:53 pm IST

Published - August 16, 2021 09:52 pm IST - THIRUVANANTHAPURAM

Arrangements are being made for the smooth transportation of a massive settling chamber for the trisonic wind tunnel being constructed at the Vikram Sarabhai Space Centre (VSSC) at Thumba here from the Kollam port.

The settling chamber for the wind tunnel was brought in two sections of 128 tonnes and 57 tonnes to Kollam from Mumbai. They will be moved to Thumba over seven days by road — at the rate of 10 km a day — on a hydraulic-axle trailer.

Coordinated efforts

The Kerala State Electricity Board and the Departments of Forests, Police and Public Works have been directed to ensure the smooth transportation as low-hanging overhead cables and tree branches could hinder the trailer’s progress.

The 128-tonne section is 9.8-m long, 5.6-m broad and 5.7-m high. The 57-tonne section is 5.1-m broad, 5.9- m long and 6.05-m high. When loaded on the trailer, the height of the cargo will be over 7 m.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.