ADVERTISEMENT

Traffic disrupted near Fort station

October 26, 2014 08:50 am | Updated May 23, 2016 04:48 pm IST - CHENNAI:

Traffic flow was briefly interrupted on Muthusamy Salai near Fort station, when construction material flowed out of the Metro Rail construction site there, on Saturday.

As the soil in the area was loose, the construction material foam flowed out of the site when the tunnel boring machine was near Muthusamy Salai. The machine was drilling from Madras High Court to Chennai Central. The area was subsequently cleaned up by workers.

A similar incident took place on railway tracks near Fort suburban railway station in August.

ADVERTISEMENT

This is a Premium article available exclusively to our subscribers. To read 250+ such premium articles every month
You have exhausted your free article limit.
Please support quality journalism.
You have exhausted your free article limit.
Please support quality journalism.
The Hindu operates by its editorial values to provide you quality journalism.
This is your last free article.

ADVERTISEMENT

ADVERTISEMENT