Vrishabhavati sewage treatment plant inefficient, says study

April 30, 2015 01:07 pm | Updated 01:07 pm IST - Bengaluru:

A trip to Mysuru from the city usually starts off with a strong whiff of the stench of the Vrishabhavati that is putrid, blackish and sluggish. Efforts to prevent sewage inflow into the river have gone down the drain.

An analysis of the sewage treatment plant (STP) at Vrishabhavati, which is the oldest STP in the city, by researchers at Ashoka Trust for Research in Ecology and the Environment (ATREE) points to bad planning and inherent inefficiency of the plant for the continuing discharge of sludge into the once-thriving stream.

‘Contribution of sewage treatment to pollution abatement of urban streams’, published recently in the journal

ADVERTISEMENT

Current Science , shows that even though the installed capacity of the plant is much lower than total sewage generated, the existing plant is underutilised and functions below “acceptable levels” of efficiency.

ADVERTISEMENT

While the capacity of the STP is 180 million litres per day (MLD), the plant only operates at 130 MLD. And even in this, just 26 MLD is raw sewage while the rest is taken from the Vrishabhavati itself.

Raw sewage has high biological oxygen demand (BOD) due to the high organic content, which provides food for the microbes of the plant. However, the mixing of nearly 104 MLD of river water, into which non-biodegradable industrial waste is dumped, results in the STP struggling to filter out waste from its outflow.

The result is that BOD is lowered by just 47 per cent, making the outflow reeking of organic waste and unsuitable for aquatic life. Similarly, chemical oxygen demand (COD) to BOD ratio is variably high, suggesting that industrial waste has not been filtered out. The plant does not seem to have had any impact on the pH (that measures acidity/alkalinity of the river), dissolved oxygen, total suspended solids, nitrates, faecal coliforms, and faecal streptococcus (depicting levels of organic material) after treatment.

ADVERTISEMENT

Moreover, with an estimated 104 tonnes of organic waste that flows in the stream daily, the STP captures just 7.5 tonnes of sludge a day, says the study.

The plant is designed to handle raw sewage and for treating the river itself. Eventually, it neither treats sewage nor cleans the river.

Priyanka Jamwal, lead researcher in the study

This is a Premium article available exclusively to our subscribers. To read 250+ such premium articles every month
You have exhausted your free article limit.
Please support quality journalism.
You have exhausted your free article limit.
Please support quality journalism.
The Hindu operates by its editorial values to provide you quality journalism.
This is your last free article.

ADVERTISEMENT

ADVERTISEMENT