ADVERTISEMENT

Tunnelling work on metro’s north-south corridor complete

April 20, 2016 12:00 am | Updated 05:32 am IST - Bengaluru:

HAPPY CAMPERS:TBM Godavari arrived at Majestic interchange station to loud cheers on Tuesday.— photo: by special arrangement

The Godavari tunnel boring machine (TBM) reached Majestic metro station on Tuesday morning, thus completing its journey which began from Sampige Road in 2013. The machine has drilled a total of 973 metres and completed the link between Nagasandra station in the north and Majestic station.

City Development Minister K.J. George, who was present at Majestic as Godvari broke through, said the North-South line of Namma Metro could open soon with the link to Majestic station complete.

On the upcoming launch of the East-West corridor, the Minister said Bangalore Metro Rail Corporation Ltd. was making last-minute safety inspections to ensure passengers’ safety.

ADVERTISEMENT

This is a Premium article available exclusively to our subscribers. To read 250+ such premium articles every month
You have exhausted your free article limit.
Please support quality journalism.
You have exhausted your free article limit.
Please support quality journalism.
The Hindu operates by its editorial values to provide you quality journalism.
This is your last free article.

ADVERTISEMENT

ADVERTISEMENT