ADVERTISEMENT

Work on Tirupparankundram road overbridge resumes

November 20, 2013 12:53 pm | Updated November 16, 2021 07:58 pm IST - MADURAI:

Construction work of the Road over Bridge at Tirupparankundram which was stopped on Monday by the former AIADMK MLA, S.M. Seenivelu, was resumed on Tuesday. Photo: G. Moorthy

Construction of piers for the road overbridge at the southern end of Tirupparankundram, which was stopped on Monday by former AIADMK MLA S.M. Seenivelu, resumed with police protection.

Assistant Engineer (Highways Department) S.K. Maharajothi Prasad lodged a complaint with the Tirupparankundram police against the obstruction created by Mr.Seenivelu on Monday.

The former MLA demanded re-alignment of the ROB, which was at an advanced stage, so that his commercial building along the Madurai-Tirunelveli Highway was not affected.

ADVERTISEMENT

On Tuesday, an earthmover dug up a huge pit on the road for erecting a pier for the 650-metre-long bridge.

The work went on from morning till evening without any problem, official sources said.

This is a Premium article available exclusively to our subscribers. To read 250+ such premium articles every month
You have exhausted your free article limit.
Please support quality journalism.
You have exhausted your free article limit.
Please support quality journalism.
The Hindu operates by its editorial values to provide you quality journalism.
This is your last free article.

ADVERTISEMENT

ADVERTISEMENT