Railways to acquire EoTT system to run trains without guards

Each set of End of Train Telemetry device is estimated to cost approximately ₹10 lakh

May 10, 2017 11:45 am | Updated 12:53 pm IST - New Delhi

The End of Train Telemetry equipment is designed to do the guard’s job by giving indication to the loco driver in case of parting of coaches or wagons from the rear side of the train. File

The End of Train Telemetry equipment is designed to do the guard’s job by giving indication to the loco driver in case of parting of coaches or wagons from the rear side of the train. File

The Indian Railways will float global tenders worth over ₹100 crore for acquiring sophisticated equipment to run 1,000 trains without guards.

The End of Train Telemetry (EoTT) equipment is used to establish communication between the locomotive driver and the last wagon of the train to ensure that the train is running with all coaches/wagons as a complete unit.

The equipment is designed to do the guard’s job by giving indication to the loco driver in case of parting of coaches or wagons from the rear side of the train.

Each set of EoTT device is estimated to cost approximately ₹10 lakh.

EoTT system comprises two units — one unit called cab display unit (CDU) fitted on the locomotive and the other is sense and brake unit (SBU) fitted on the last coach or wagon of the train.

Both the units are fitted with radio transmitter which communicate with each other.

In case of a train parting, the system is designed to indicate to the driver the parting of the train and to apply brakes to the rear unit, thus averting collision of the rear portion with the front portion of the train.

Railways will acquire 1,000 EoTT equipment to begin with for its container operations and later more such unit will be procured for all trains.

All goods trains on the proposed dedicated freight corridors will run with EoTT system.

“We will invite financial bids for acquiring 1000 EoTT equipment in the first phase,” said a senior Railway Ministry official involved with the project.

The official said the EoTT equipment is used to establish communication between locomotive driver and the last vehicle of the train to see that the train is running with all coaches/wagons as a complete train.

There is a transmitter fitted on a locomotive and a receiver that is fitted on the end of the last vehicle.

The transmitter and the last vehicle receive exchange signals at regular intervals to ensure that the train is running intact.

If there is a break in the communication between the two units, the driver gets a signal that the train has parted, the official said.

The transmitter unit, fitted at the end of the train’s last wagon is connected to the brakes and it exhausts the brake pipe air and applies brakes to the broken away portion of wagons so that they do not collide.

Railways had earlier undertaken the trial run of the EoTT system successfully.

The EoTT system in 1,000 trains is expected to be operational in the current fiscal.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.