The Executive Committee of the Mumbai Metropolitan Region Development Authority on Monday approved the appointment of Spanish consulting firm Ayesa Ingenieria Arquitectura as the detail design consultant for the 16.5-k.m.-long Rs.6,208-crore Andheri–Dahisar metro corridor.
Ayesa will develop architectural, electrical and mechanical plans and designs of all the 14 stations, design the depot, and check contractors designs .
“We are sure of starting construction of the corridor post monsoon”, said U.P.S. Madan, Metropolitan Commissioner, MMRDA.