TTPS suffers technical problem

January 27, 2017 11:46 pm | Updated 11:46 pm IST - THOOTHUKUDI:

Three power generating units of the Thoothukudi Thermal Power Station (TTPS) suffered a technical problem on Wednesday night.

Production in first, fourth and fifth units came to a halt at 10.37 p.m. following a burst in the transformer in the switch yard inside the plant, sources told The Hindu on Thursday. As a result, feeders

of these units tripped. The fifth unit resumedproduction at 8.30 a.m. on Thursday. A technical team lit up the third unit, which was kept on standby, in the morning and production resumed, sources said. Only the third unit with its production capacity of 210 MW and the fifth unit with the same capacity were operational now.

Currently, there is no growing demand for electricity as cold weather is prevailing in several parts of the State.

The other three units with 210 MW capacity each were kept on standby, sources said.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.