Special Correspondent

CHENNAI: Due to line block/power block in connection with the launching of girder at level crossing No.30 at Tambaram Yard (Vandalur end) on September 26 and 27, the following will be the revised pattern of working of trains.

The level-crossing will be closed during the block period and vehicular traffic will be diverted through the limited use subway.

Suburban services

On September 26 only skeletal services at 15 minutes frequency will be maintained between 6.30 a.m. to 10 p.m. and 30 minutes frequency between 4.30 a.m. to 6.30 a.m. and 10 p.m. to midnight between Chennai Beach and Tambaram in both directions. The frequency of services on the Chennai Beach - Chengalpattu section will be at one hour interval from 6 a.m. to 9 p.m. There will be no fast services and Ladies Special in both directions.

Main Line Express/Passengers

Train No. 113/114 Tambaram – Villupuram – Tambaram Passengers will be partially cancelled between Chengalpattu and Tambaram.

More In: TAMIL NADU | NATIONAL