SEARCH

‘PM asked for speeding up of Ennore work’

print   ·   T  T  
A standard steam turbine made by Toshiba being transported by a multi-axle vehicle. The Japanese firm wants roads strong enough to bear the 500-tonne turbine between its facility at Napalayam near Manali 25 km from Chennai, and Ennore Port for onward export. — Photo: Special Arrangement.
A standard steam turbine made by Toshiba being transported by a multi-axle vehicle. The Japanese firm wants roads strong enough to bear the 500-tonne turbine between its facility at Napalayam near Manali 25 km from Chennai, and Ennore Port for onward export. — Photo: Special Arrangement.

Infrastructure bottlenecks in and around the Manali industrial area will be removed soon, as Manmohan Singh has directed authorities to move quickly to clear them

More In: TAMIL NADU | NATIONAL
The Hindu presents the all-new Young World

O
P
E
N

close

Recent Article in TAMIL NADU

PIL plea against CBSE circular dismissed

The Madras High Court on Wednesday dismissed a public interest litigation petition seeking to declare unconstitutional a CBSE circular to... »