ISRO abuzz over heavy-lift rocket launch on June 5

India eyes slot in 4-tonne club of five developed nations

June 02, 2017 10:04 pm | Updated 10:05 pm IST -

Panoramic view of the GSLV-Mk III-D1 being moved to the second launch pad in Sriharikota on June 2, 2017.

Panoramic view of the GSLV-Mk III-D1 being moved to the second launch pad in Sriharikota on June 2, 2017.

An anxious Indian space establishment is keeping its fingers crossed over the launch of its new and most powerful rocket on June 5.

On that evening, the indigenous GSLV-Mark III makes a bid to breach a heavy-lift rocket club that can put four-tonne satellites into space. The U.S., Russia, Europe, China and Japan are already there.

The first development vehicle, called GSLV-MkIII D-1, is slated to fly from the Satish Dhawan Space Centre at Sriharikota at 5.28 p.m., says the Indian Space Research Organisation.

The success of the first full flight of Mk III will mean that soon, Indian communication satellites can be lofted into space from within the country. It will also improve ISRO’s ability to reach heavier satellites to both — the higher geostationary transfer orbit or GTO of 36,000 km; and to low-Earth orbit or LEO of up to 800 km.

 

ISRO Chairman and Secretary, Department of Space, A.S.Kiran Kumar, told The Hindu , “MkIII should enable us to launch communication satellites totally in India without going out. That is the primary aim.”

“We are improving our capacity to put higher payloads into GTO and LEO. What we now have with MkII is capability for lifting 2.2 tonnes to GTO. This rocket will give us a higher weight capability than what we now have, for both GTO and LEO. Since 1995, we launch all Earth observation satellites [which are smaller] ourselves on the [lighter lifting] PSLV rocket. Once we are through with GSLV MkIII, we will be able to launch all communication satellites ourselves.”

Independence apart, an indigenous launch vehicle also means lower cost of putting spacecraft to orbit, said K.Sivan, Director of the lead rocket development centre, Vikram Sarabhai Space Centre, Thiruvananthapuram.

Larger payload soon

Payload fairing (the protective nose cone) with GSAT-19 is being integrated in Sriharikota on June 2, 2017. ISRO’s GSLV-Mk III-D1 rocket, carrying communication satellite GSAT-19, is scheduled for launch on June 5, 2017.

Payload fairing (the protective nose cone) with GSAT-19 is being integrated in Sriharikota on June 2, 2017. ISRO’s GSLV-Mk III-D1 rocket, carrying communication satellite GSAT-19, is scheduled for launch on June 5, 2017.

 

The first payload, communication satellite GSAT-19, however, has been kept below 4 tonnes — at a safe 3,136 kg. “We will subsequently increase the payload,” Mr. Kiran Kumar said. Communication spacecraft are generally put into GTOs first (the orbit is adjusted over days.)

The need for a 4T launcher has become urgent in recent years. The first and second generation Indian communication spacecraft used until the late 1990s were around 2,000 kg (two tonnes) with about 24 transponders. Today they are over 3 tonnes and carry more transponders.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.