River-linking project won't be allowed through tiger reserve: Jairam

“24 km of proposed link canal between Teesta and Sankosh rivers runs through Buxa Tiger Reserve”

October 04, 2010 02:43 am | Updated 02:43 am IST - KOLKATA

The linking of two major rivers in north Bengal – as part of the National River Linking Project – would not be allowed through the Buxa Tiger Reserve (BTR), said Union Minster of Environment and Forests, Jairam Ramesh on Sunday.

Environmental concerns related to the project – particularly the splitting of the elephant corridor into two parts and the cutting down of trees to make way for the canal – were raised by State's Forest Department officials during Mr. Ramesh's visit to north Bengal on October 1.

“I will take up the matter. The project will not be allowed if Buxa is submerged,” Mr. Ramesh told The Hindu over telephone, adding that an alternative must be sought.

Of the 137 km of the proposed link canal between the Teesta and Sankosh rivers, 24 km runs through the BTR and another nearly 35 km through other forest areas, said R. P. Saini, BTR's field director.

Important component

According to information provided by the Water Resources System Division of the National Institute of Hydrology, this link is an important component in the planned link between Manas, Sankosh, Teesta and the Ganga that will connect the Ganga and the Brahmaputra. Dams are proposed at Manas and Sankosh as a part of the project.

The link passes through parts of north Bengal that shares a border with Bangladesh thus raising security concerns as well.

“If executed, the project would cause a major disturbance in the forest areas. Firstly, it would split the elephant corridor, which was already fragmented towards the south of the reserve by a Railway line, into two zones,” said Dr. Saini.

Secondly, to construct a canal that is eight to ten metres broad would mean lakhs of trees have to be chopped. It would also affect tiger and rhino conservation efforts and cause irreparable damage to herbs, shrubs, soil and other things that constitute the biodiversity of these forest areas, he added.

In 2009, the National Water Commission has suggested an alternative route between Jagihopa and Faraka through the Teesta which passes through a forest free zone. However, this may require a greater investment because of an unfavourable gradient in some places, Dr. Saini said.

“Despite the expense, we must press for the alternative channel to be used because the environmental cost that the project demands is huge,” he added.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.