Installation of subsidised domestic solar photovoltaic systems may begin soon

TANGEDCO, will shortly place orders for procurement of bi-directional meters

May 06, 2014 02:07 am | Updated 02:07 am IST - CHENNAI

The much-awaited installation of subsidised domestic solar photovoltaic (SPV) systems may begin soon with the relaxation of the model code of conduct for the Lok Sabha elections.

Though the authorities cleared applications from 500 domestic consumers before the code came into effect, certain issues hampered the process. The major issue pertained to net meters (bi-directional meters) in place of the existing consumer meters. These meters will record the quantum of energy supplied to the consumer and what has been generated at the consumer end.

Enquiries with authorised vendors reveal that the consumers were keen on the installation of net meters at the time of putting up the main system. The Tamil Nadu Generation and Distribution Corporation (TANGEDCO), which could not finalise the tender for net meters because of the model code, will shortly place orders for the procurement of net meters, says an official of the Tamil Nadu Energy Development Agency (TEDA), the nodal organisation for the scheme for installing domestic SPV systems. The meters are expected to be available in a month. The installation of the domestic SPV systems forms part of the State government’s scheme for capital incentive for solar rooftop units. One of the aims is to cut the power bill of consumers, especially those at the high end. The reduction will be achieved through net metering. The battery-less systems will be linked to the grid. For an individual home or a flat, the solar system capacity will have to be 1 KW (kilowatt). For the residential flats, it can be 5 KW or 10 KW, or multiples thereof.

Given that a one-KW system generates 1,500 units a year, if a beneficiary consumes over 500 units bi-monthly, the annual savings will be Rs. 8,625 as the tariff is Rs. 5.75 a unit for those who use more than 500 units.

In the coming weeks, the applications of 1,200 more consumers will be cleared, the official says. The plan is to give sanction to 5,000 consumers during 2013-2014 and another 5,000 this year.

The TEDA has published on its website the names of authorised vendors along with the details of the cost of the systems. Factoring in the Centre’s subsidy of Rs. 30,000 and the State’s incentive of Rs. 20,000, the net cost of a one-KW system ranges from Rs. 43,700 to Rs. 60,000.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.