Laying high speed train corridor to cost Rs. 80,000 crore

March 16, 2015 01:58 pm | Updated November 16, 2021 07:16 pm IST - New Delhi

A file photo of a bullet train on the Yongdinghe bridge in Beijing. The cost of laying one km of high speed track costs about Rs.100 crore.

A file photo of a bullet train on the Yongdinghe bridge in Beijing. The cost of laying one km of high speed track costs about Rs.100 crore.

Construction of one kilometer of high speed railway track will cost Rs. 100-140 crore and the country will need a total of Rs 80,000 crore to lay the entire high speed train corridor, Lok Sabha was informed on Monday.

Railway Minister Suresh Prabhu said the cost of laying one km of high speed track was 10 to 14 times higher than the construction of a normal railway track.

“We will need Rs 80,000 crore to construct the entire length of the planned high speed tracks,” he said replying a supplementary during question hour.

Mr. Prabhu said Indian Railways currently does not have any high speed corridor and such corridors identified for pre-feasibility studies included Pune-Mumbai-Ahmedabad, Delhi-Agra-Lucknow-Varanasi-Patna, Howrah-Haldia, Chennai-Bengaluru-Coimbatore-Ernakulum-Thiruvananthapuram.

“A joint feasibility study for Mumbai-Ahmedabad high speed corridor co-financed by India and Japan, which started in December 2013, is targeted for completion in June 2015,” he said.

The Minister said a provision of Rs 33 crore was made in the last Railway Budget for a study of Diamond Quadrilateral and other high speed rail corridors and Rs 40 crore has been proposed in the current budget 2015-16 for it.

“A provision of Rs 19 crore has been included for feasibility study of Mumbai Ahmedabad High Speed Railway Corridors in the Railway Budget 2015-16,” he said.

Presently, the maximum speed is 150 kmph of Shatabdi Express on the Delhi-Agra section while the average speed of Mail and Express trains in India in 2013-14 was 50.6 kmph.

Replying to another question, Mr. Prabhu said there were 80 train accidents in 2014-15 till February 2015 in which 123 people lost their lives and 335 injured. In 2013-14, there were 71 train accidents in which 54 people were killed and 119 were injured.

It has been found that in 2014-15, 57 accidents took place due to failure of railway staff, which was 50 in 2013-14.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.