C-DIT installed solar panel at CMO: Minister

June 21, 2013 04:13 am | Updated November 16, 2021 11:58 pm IST - THIRUVANANTHAPURAM:

Minister for Information and Public Relations K.C. Joseph has said that the solar panel at the Chief Minister’s Office (CMO) was installed as part of the Soorya Keralam campaign of the Centre for Development of Imaging Technology (C-DIT) and that there was nothing controversial or illegal about the installation.

Addressing a press conference here on Thursday, Mr. Joseph termed the Opposition’s attempt to put the solar panel installation at the CMO under a cloud by levelling ‘baseless’ allegations unfortunate. The panel was installed in June 2012 at a cost of Rs.2.2 lakh, when the Centre’s regulations had stipulated the cost for a 1 kW solar panel at Rs.2.7 lakh.

The unit, which generates five units of power a day, has produced about 1,500 units so far, powering over 20 tube lights and fans at the CMO. The installation, including the maximum power point tracking charger and inverter, was done by Megabyte Technologies. The solar panel was supplied by Ammini Solar Pvt Ltd, a firm recognized by the Union Ministry of New and Renewable Energy. The tubular battery was supplied by AMCO Batteries, another Ministry-approved company, Mr. Joseph said.

Stating that Megabyte Technologies was selected on the recommendation of energy expert and social activist R.V.G. Menon, a member of a high-level committee on solar energy, Mr. Joseph said Dr. Menon had suggested the company since he himself had obtained its services for his residence. ‘‘No tender procedures were followed since this was just part of C-DIT’s Soorya Keralam campaign and to showcase the use of solar power at the CMO,’’ he said.

The Agency for Non-Conventional Energy and Rural Technology (ANERT) had not empanelled any firm at that time, and it was only six months later that ANERT’s list of empanelled firms for installation of solar panels in the State was released. Megabyte had found a place on the list by then, the Minister said adding that neither Megabyte nor C-DIT had availed itself of any subsidy for the installation. In fact, they had managed to do the installation at a cost Rs.50,000 less than the then approved rate.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.