Nod for swimming pool at BR stadium in Guntur

June 09, 2013 02:05 pm | Updated 02:05 pm IST - GUNTUR

The Guntur Municipal Corporation (GMC) has got administrative sanction from the government for constructing a swimming pool in the Brahmananda Reddy (BR) stadium at an estimated cost of Rs. 3 crore.

It is going to be the second swimming pool in the city after the existing one at Ravindra Nagar.

The new swimming pool will be constructed in an area of 1,200 square metres for organising summer camps and encouraging youth to take to swimming as an exercise and also as a sporting event.

Guntur East MLA Sk. Mastan Vali wanted the swimming pool to be constructed, and it was immediately endorsed by GMC Special Officer and district Collector S. Suresh Kumar.

The GMC has been permitted to construct the swimming pool by utilising Rs.1.25 crore available under the Building Penalisation Scheme and Rs.1.75 crore from the general account.

The technical clearances are to be obtained from the Engineering-in-Chief of the Public Health Department, Hyderabad.

Once the requisite permissions are in place, construction of the facility will start and meet global standards on completion.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.