NE monsoon at the door, Chennai unprepared

October 21, 2013 02:21 am | Updated November 17, 2021 05:04 am IST - CHENNAI

Chennai,09/10/2013:For City:Improving facilities: Construction of storm water drains at Poombuhar Nagar,Kolathur in Chennai on Thursday. Photo:B_Jothi Ramalingam

Chennai,09/10/2013:For City:Improving facilities: Construction of storm water drains at Poombuhar Nagar,Kolathur in Chennai on Thursday. Photo:B_Jothi Ramalingam

Conditions are favourable for the commencement of the North East monsoon in 48 hours, according to the Meteorological Department. And the imminent monsoon has intensified a sense of unpreparedness. Incomplete stormwater drain networks and a lack of measures to combat monsoonal diseases are among concerns raised by residents.

On Sunday, satellite imagery showed convective clouds rising over coastal Tamil Nadu. And with 71 per cent of the rain gauge observatories in Tamil Nadu registering rainfall on Sunday, the Meteorological Department had reasons to conclude that NE monsoon is at the door.

“There has been plenty of rain today [Sunday]. Over 71 per cent of 285 stations in Tamil Nadu have registered rainfall today,” said Y.E.A. Raj, Deputy Director-General of Meteorology, Regional Meteorological Centre, Chennai. By 8.30 p.m. on Sunday, Nungambakkam recorded 16.6 mm of rainfall and Meenambakkam, 5 mm.

The India Meteorological Department would also factor in the rains in Andhra Pradesh before making an announcement about the onset of the monsoon, likely on Monday.

“This year, we do not have a clear dry spell separating the withdrawal of the South West monsoon and the onset of the North East monsoon,” said Dr.Raj. This year, the monsoon is expected to bring significant amount of the 140 mm of rainfall received annually in Chennai. As usual, the city is bracing for the monsoon. Various parts of Chennai are not equipped to cope it. Officials say most of the drains within the old city limits remain clogged. In most parts of the new zones, stormwater drains are yet to be installed. If the monsoon produces plentiful rain, a slew of ongoing road works under the Mega City Development Mission will be considerably delayed.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.