Rain hits production in Vizag steel plant

October 28, 2013 02:21 pm | Updated 02:21 pm IST - VISAKHAPATNAM:

The incessant rains since Monday last due to the depression in the Bay of Bengal have affected the production in the Vizag Steel Plant.

According to VSP sources, the plant is at present operating at 30-40 per cent of its capacity. Since its commissioning, the plant has not faced such a situation, the sources pointed out. Rains have badly affected the handling of coal and coking coal at Gangavaram Port for the past four to five days and coal supply has almost stopped.

The privately operated Gangavaram Port is located almost in the backyard of the steel plant and coal is taken to the plant through conveyor systems. Coking coal is imported from Australia for the plant.

The available coal is being judiciously used to keep the systems - coke oven, the SMS and the blast furnaces – going and the transfer of the coal from the stockyards to various units has become very difficult as the rains have turned it slurry.

The conveyors systems are not built to carry such slurry, the sources pointed out. Further, captive power generation has also been affected for want of coal supply.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.