Aruvikkara’s tourism potential to be explored

June 12, 2013 12:50 pm | Updated June 24, 2016 02:23 pm IST - THIRUVANANTHAPURAM:

Finance Minister K.M. Mani lays the foundation stone for a ‘bali mandapam,’‘balikadavu’ and check dam at Aruvikkara Dam in Thiruvananthapuram district on Tuesday. Speaker G. Karthikeyan and Water Resources Minister P.J. Joseph are seen. Photo: S. Gopakumar.

Finance Minister K.M. Mani lays the foundation stone for a ‘bali mandapam,’‘balikadavu’ and check dam at Aruvikkara Dam in Thiruvananthapuram district on Tuesday. Speaker G. Karthikeyan and Water Resources Minister P.J. Joseph are seen. Photo: S. Gopakumar.

The green environs of Aruvikkara, known mainly for its reservoir that quenches the capital city’s thirst, is on the threshold of a major facelift, Finance Minister K.M. Mani has said.

Speaking after laying the foundation stone for a ‘bali mandapam,’ ‘balikadavu,’ and a check dam to be constructed by the Kerala Water Authority and the Irrigation Department near the Aruvikkara dam here on Tuesday, Mr. Mani said the area held immense potential as a tourist spot. It was already gaining in popularity as a pilgrim centre with several hundreds flocking the area to offer ‘bali.’ But at the same time, the dam and its environs were the ideal spot for tourists and had to be developed keeping that in mind, he said.

Mr. Mani said the government had accorded administrative sanction for a non-banking sub-treasury at Vellanad in the same constituency.

The ‘balikadavu,’ to be of 100 metres in length and 20 metres in width, would be constructed about 300 metres from the Aruvikkara temple alongside the Karamana river at a cost of Rs.1.6 crore. The Rs.1 crore check dam would come up another 100 metres away from the ghat, to store water up to a height of 1.5 metres. The Rs.1 crore-first phase of the ‘bali mandapam’ would come up with a 1,200 square-feet granite floor with stairs and facilities for the aged and physically challenged as well to offer ‘bali,’ and separate arrangements for women.

The e-tender process has already been set in motion, and the work is expected to begin in July and completed in nine months.

The entire project was estimated at Rs.7.1 crore.

Water Resources Minister P.J. Joseph presided. Mr. Karthikeyan welcomed the gathering. A. Sampath, MP, Travancore Devaswom Board president M.P. Govindan Nair, Chief Engineer (Irrigation) P. Lathika, and Chief Engineer (KWA, South) P. Sreekumaran Nair were present.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.