Now, power from vegetable waste

November 15, 2013 10:05 am | Updated July 08, 2016 01:18 am IST - COIMBATORE:

In an effort aimed at processing degradable waste and also generating power, the Coimbatore Corporation has mooted a proposal to generate power from waste obtained from vegetable markets in the city.

A resolution adopted at the Corporation’s Urgent Council meeting on Thursday said that through the biomethanation process the Corporation would built waste-to-energy plants of various capacities — depending on the quantity of waste generated, which could vary from three to 10 tonnes.

The Corporation would build the plants with its fund or go in for public private partnerships to construct the plants.

On a pilot basis, the Corporation would build the first plant at the proposed vegetable market in Kavundampalayam.

After estimating the quantity of garbage generated at five tonnes, the Corporation had proposed to construct a bio-methanation-cum-power generation plant. It had floated an e-tender on July 18, 2013. As there was only one bidder, the Corporation was forced to cancel the tender and float a second on September 18. The second attempt saw bids from two players. Of those, the Corporation’s tender scrutiny committee had decided to award the tender to a Pune-based engineering company which that quoted Rs. 89 lakh for the construction of the plant and Rs. 72 lakh for a seven-year maintenance period.

The Council approved of the resolution.

Similarly, it also decided to seek expression of interest from companies for process plastic waste. A resolution adopted in this regard said that to explore the possibilities of processing the plastic waste to manufacture other products, the Corporation would like to invite companies with the necessary technologies. It was imperative to do so because the segregated collection of waste in Ward 23 had yielded plastic waste that could be processed.

Plus, as the Corporation was about to extend the segregated collection system under the Shunya zero waste management scheme, there was every possibility that the quantity of plastics so collected would go up.

Along with the two waste management proposals, the Corporation also decided to seek the State Government’s administrative sanction for the 24X7 water supply scheme, handover roads to the State Highways Department for constructed of road-over bridges and accept the bids for constructing a foot-over bridge near the Coimbatore Medical College Hospital junction.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.