SEARCH
In-depth

This section will feature stories organised under individual categories, providing a resource for in-depth study of particular topics. It will get richer as more stories are added to the website.

Browse topics
economy, business and finance »  construction and property »  civic infrastructure
Filter by
Latest From This Topic
VISAKHAPATNAM, Wednesday, November 26, 2014

Makeover need of the hour

Dotted with a number of tiny shops, Chaitanya Nagar still remains a cramped one. Dozens of tiled houses in the locality have been damaged due to the very severe cyclonic storm Hudhud that ravaged the city last month. »
More on civic infrastructure AND: Andhra Pradeshconstruction and propertygreen infrastrucutrehouse buildingVisakhapatnam
HYDERABAD, Tuesday, November 25, 2014

MMTS phase II works back on track

Officials confident of the works being completed on time. Phase II of MMTS will enhance connectivity between Ghatkesar and Sanathnagar via Moula Ali (37 km), Bolarum-Medchal (14 km), Falaknuma-Umdanagar (14 km). »
More on civic infrastructure AND: design and engineeringHyderabadmass transitrailway
HYDERABAD, Tuesday, November 25, 2014

TS to keep L&T in the loop on metro rail alignment

Changes proposed in three sites. Mr. Owaisi gave a note suggesting the change in alignment in the old city while pointing out that, otherwise seven temples, 28 mosques and about 1,000 structures would get affected. »
More on civic infrastructure AND: design and engineeringHyderabadmass transitrailway
Pages: «  ‹   ›  »
Pages: «  ‹   ›  »
More Articles about:  civic infrastructure
Browse topics